Bakery | Snacks

Mondelez International | formerly Nabisco Company

Shambaugh oversaw all general construction services, as well as the installation of mechanical, electrical, and plumbing systems, for a new manufacturing facility— which helped increase client operating efficiency significantly.

View Case Study

Pretzels, Inc.

Working on fast-tracked schedule, Shambaugh helped to limit potential productivity and revenue losses through rapid-response damage control after a fire ravaged the client’s 77,000-square-foot production facility.

View Case Study

Tyson Foods

For this six-month fast-track, turnkey, design-build project, Shambaugh oversaw installation of all mechanical and electrical, wastewater, process piping, utilities, and fire protection systems—and fabricated all specialty equipment at their in-house shop.

View Case Study

Wyandot, Inc.

For this fire rebuild project, Shambaugh fast-tracked construction services to complete the project five months ahead of schedule. The final design ultimately won the project a 2009 Food Plant of the Year award.

View Case Study